
New TopShim run:

version = topshim 2.4.0
date = 2024-10-10
time = 17:32:04.880
command = topshim  convcomp tuneaxyz

FINE SHIMMING

Parameters:

probe = Z116098_0395
solvent = CDCl3
shim nucleus = 2H
nucleus optimised for = 13C
o1p (from lock) = 7.24 ppm

Results:


1D Shimming:
Iteration  1: FWHM Before= 2.6 Hz, Target= 0.8 Hz, After= 1.4 Hz
Iteration  2: FWHM Before= 1.4 Hz, Target= 0.5 Hz, After= 0.7 Hz
Iteration  3: FWHM Before= 0.7 Hz, Target= 0.3 Hz, After= 0.6 Hz
Iteration  4: FWHM Before= 0.6 Hz, Target= 0.4 Hz, After= 0.4 Hz
Iteration  5: FWHM Before= 0.4 Hz, Target= 0.4 Hz
Shim succeeded

Lineshape quality factor (1D spectrum, spinning) = 0.641


Performing tune after shimming
tune lock level increase = 1.4

shim changes: 
Z	-12
Z2	-55
Z3	+103
Z4	-226
Z5	+70
X	+141
Y	+100

duration = 2 min 59 sec
completed successfully
finished Thu Oct 10 17:35:02 2024


========================================================================
